MN2014

About:

This page summarizes or links to all information on our 2014 summer field season in Manhattan ("MN2014")

Checklist:

Both:

- Students review plot map

- Ground truth the plot map

- Encode plot map with R and layout plot order

NAM:

- List of NAM seed packets, including which are missing

- 50 seeds/packet, 1 rep [DONE]

SAP:

- 50 seeds/packet, 2 reps [DONE]

- Design plot order (complete random block)

- Put in planting order

Our field site:

Our plots will be the triangular parcel (4.3acre/1.75ha) on the west side of College Avenue (Field "L") which was in wheat last year

NE corner: 39.212661, -96.598338

SE corner: 39.211547, -96.598374

NW corner: 39.212686, -96.600969

The parcel is about 225m wide and 125m long

Overview of experiments:

There are three sets of germplasm that will be planted:

Seed preparation:

Seeds treated [with seed safener -- check this]

  • SAP:
    • Seed from Tesfaye Tesso (Mostly from 2009, list of seed)
    • 2 packets X 100 seeds/packet
    • Treatments done
  • NAM founders:
    • Seed from Ram Perumal (Hays)
    • 2 packets X 100 seeds/packet
    • Treatments done, Sophie has seed
  • NAM population:
    • Seed from our winter nursery in Puerto Rico (PR1314)
    • 2 packets X 100 seeds/packet
    • Treatments done
    • Add fill packets for missing spots

Plot Plan:

  • 4 row planter, 75cm spacing
  • 3m plot length with 1 m alley
  • SAP:
    • Two randomized complete blocks, one in NW and one in SE
  • NAM founders:
    • Two randomized complete blocks, one in NW and one in SE
  • NAM population:
    • Put each family (n=250) in its own bed
    • Put each line (1 through 2500)
    • Use fill around each bed
    • Use 6 foot alleys between each bed
  • Original plot plan for planting (not corrected for planting mistakes)
  • Original plot map for planting (not corrected for planting mistakes)
  • Corrected plot table

Planting:

  • Tesfaye and Daniel are doing the planting
  • Planted on Friday June 20, 2014
  • In Hays, planted on Wednesday June 18, 2014
  • NAM population in Manhattan: Germination started on June 23, 2014

Quality control and labelling:

Barcode Label Tagging:

Phenotyping:

  • Flowering Time:
    • Routine check for flowering date and scoring to commence on 08/02/2014 which marks the 45th days after emergence.
    • Selfing and bagging of the flowered plants to be carried out simultaneously in accordance to protocol.
  • Field notes (with links to protocols and data)